Keren and Don haul and sort rock by size in preparation for building the wall.
Viki cuts a trench at the base of the berm in preparation for the foundation.
Concrete rip-rap set in gravel is used as the foundation for the wall.
Keren and Heather building one of the final courses of rock and filling the voids with gravel. Notice the old blue jeans used as weed barrier on the berm.